NASA-LLIS-0060

Lessons Learned - Effective Tagout and Lockout Compliance; Upper Limit Switches Utilized as Operational Stops; Momentary Switches; Wire Rope Spooling System; Access Platform Load Rating; Telescoping Tubes of the OPF Access Platform System; Commonality Between High Bay 1 and High Bay 2 Payload Bay Access Platforms

active, Most Current
Organization: NASA
Publication Date: 20 February 1985
Status: active
Page Count: 3
scope:

Description of Driving Event:

During final closeout operations of the space shuttle orbiter in High Bay 2 of the Orbiter Processing Facility (OPF), a payload bay access platform fell from its stowed position, damaging the orbiter's left payload bay door and injuring a technician. The platform's hoisting cable was previously weakened when technicians used the platform system while it was tagout/lockout. The weakened cable continued to stretch and break, even though the technicians returned it to its stowed position.

Document History

NASA-LLIS-0060
February 20, 1985
Lessons Learned - Effective Tagout and Lockout Compliance; Upper Limit Switches Utilized as Operational Stops; Momentary Switches; Wire Rope Spooling System; Access Platform Load Rating; Telescoping Tubes of the OPF Access Platform System; Commonality Between High Bay 1 and High Bay 2 Payload Bay Access Platforms
Description of Driving Event: During final closeout operations of the space shuttle orbiter in High Bay 2 of the Orbiter Processing Facility (OPF), a payload bay access platform fell from its stowed...