UNLIMITED FREE ACCESS TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NASA-LLIS-0925

Lessons Learned - KAO (Kuiper Airborne Observatory) Cavity Wall Deflections

active, Most Current
Organization: NASA
Publication Date: 20 February 2001
Status: active
Page Count: 2
scope:

Description of Driving Event:

During the post modification pressure test, the fore and aft cavity walls deflected inward until it reached the full pressure (8.0 psi) deflection value at only 2psi. The test was stopped because of the large deflections present at only 2psi. An investigation was performed to determine the cause of the large deflection at 2psi. It was determined that the contractor had underestimated the cavity wall stiffness by a factor of 4.

Document History

NASA-LLIS-0925
February 20, 2001
Lessons Learned - KAO (Kuiper Airborne Observatory) Cavity Wall Deflections
Description of Driving Event: During the post modification pressure test, the fore and aft cavity walls deflected inward until it reached the full pressure (8.0 psi) deflection value at only 2psi....
Advertisement