This document references:
S1156 - Gauging and Clearances
Published by LUL
on
August 1, 2021
This standard applies to all London Underground (LU) track including running lines depot track and sidings and to the vehicles that are approved to operate on this track. It applies to all platforms...
This document references:
1-691 - Information
Published by LUL
on
July 1, 2010
This Standard applies to all parties within LUL and all Entities and sets down the appropriate level of Information management compatible with the requirements of London Underground including those...
This document references:
S1156 - Gauging and Clearances
Published by LUL
on
August 1, 2021
This standard applies to all London Underground (LU) track including running lines depot track and sidings and to the vehicles that are approved to operate on this track. It applies to all platforms...
This document is referenced by:
R0049 - Maintenance Assurance Plan (Track) 2014-2015
Published by LUL
on
March 1, 2014
Purpose This Maintenance Assurance Plan (MAP) describes the arrangements for the assurance of London Underground BCV/JNP/SSL maintained Track assets. This plan also references the ongoing maintenance...
This document is referenced by:
G3201 - Maintaining plain line track
Published by LUL
on
March 1, 2014
This handbook covers the preparatory stages of identifying and planning maintenance work (section 4), the necessary safety and protection measures for work on and about the track (section 5) which...
This document is referenced by:
G3204 - Maintaining junctionwork
Published by LUL
on
July 1, 2014
This handbook looks at the maintenance of the component parts of junctionwork and offers practical guidance on the best ways to prevent failure. The primary maintenance activity of condition...
This document is referenced by:
S1162 - Conductor rail – Performance, design and configuration
Published by LUL
on
September 1, 2021
This standard applies to the conductor rail system. It covers: a) the fundamental design criteria to be met in any new proposal involving the conductor rail system b) requirements to avoid the...