4.1 This standard builds on the concepts and organizational framework established in Classification E1557. This classification describes transportation surface elements that are major components of most vehicular transportation surfaces. The elemental classification is the common thread linking...
4.1 When preparing construction, project, and program cost estimates, it is often necessary to make monetary provision for change or risk, or both, or other exigencies where information is incomplete. 4.2 Such allowance, contingency or reserve sums are employed by many persons engaged in the...
1.1 This guide covers schedule beta (ßs), which measures construction project participant schedule performance versus that of the overall completed project and is based on beta (ß) from financial portfolio theory for measuring the correlation between individual stock performance and that of...
3.1 The objective of this guide is to provide near-miss reporting guidance for maritime vessels to promote standardization of near-miss reporting which will allow for better use of the data industrywide. 3.2 Importance of Near-Miss Reporting: 3.2.1 Most accidents/incidents are preceded by a chain...
4.1 Use-The standard is intended for use on a voluntary basis by an estimator of costs and liabilities for environmental matters. The user may elect to apply this standard for any or all uses outlined in the Purpose. Application of this standard for one use does not compel application of the...
The scope of this document is the concept of operations including reference system architecture, the user needs, the system functional and performance requirements, the messages, the corresponding data frames and elements, and other related functionality to enable V2X-based fee collection and other...
5.1 This guide is intended for use by communities, which may include towns, incorporated cities, counties, or similar entities with the authority to convene and implement resilience planning. The process described in this guide may have applications to a broader set of users, such as those...
1.1 This practice focuses on addressing and reporting losses of tangible property. 1.2 Loss occurrences are key aspects of risk management. Projecting the possibility or probability of losses, discovering, disclosing, reporting, managing, and minimizing losses to a reasonable extent is a critical...
4.1 Activity and use limitations are typically used in conjunction with risk-based decision-making principles in Federal, state, tribal, and local remediation programs, or where residual chemicals of concern remain following an evaluation of risk or following the implementation of a remedial action...
4.1 The Use of this Standard Guide-This guide addresses issues related solely to adaptation strategies and development of a plan to address extreme weather and related physical changes. This guide does not include specific guidance on risk assessment, however references are provided in Appendix X3....
1.1 This specification provides the criteria for the administrative agency that has regulatory authority as granted by the authority having jurisdiction AHJ to evaluate the capabilities and qualifications of building evaluation agencies, that performs system analysis or compliance assurance or both...
1.1 This guide covers information for evaluating tank systems for operational conformance with the Federal technical standards (including the financial responsibility requirements) for underground storage tanks (USTs) found at 40 Code of Federal Register (CFR) Part 280. 1.2 This guide does...
4.1 Uses-This guide is intended for use on a voluntary basis by a reporting entity that provides disclosure in its financial statements regarding financial impacts attributed to climate change. The degree and type of disclosure depends on the scope and objective of the...
4.1 A clearance examination of abatement areas and other areas associated with other lead-hazard control activities, or building maintenance or modification activities in multifamily dwellings having similar units, common areas or exterior sites is performed to determine that the clearance area is...
1.1 Purpose-The purpose of this guide is to provide a series of options or instructions consistent with good commercial and customary practice in the United States for environmental liability disclosures accompanying audited and unaudited financial statements. This guide is consistent with...
This document provides a uniform structure for the identification of financial instruments as well as referential instruments (see Annex A) using a unique identification code and associated minimum descriptive data (see Annex B).
This document provides a uniform structure for the identification of financial instruments as well as referential instruments (see Annex A) using a unique identification code and associated minimum descriptive data (see Annex B).
PURPOSE. This Instruction establishes policy and guidance for the Personal Financial Management Program (PFMP) and prescribes associated responsibilities of various organizational components.
ISO/IEC 30163:2021 specifies the system requirements of an Internet of Things (IoT)/Sensor Network (SN) technology-based platform for chattel asset monitoring supporting financial services, including: - System infrastructure that describes functional components; - System and functional...
1.1 This guide covers information for evaluating tank systems for operational conformance with the Federal technical standards (including the financial responsibility requirements) for underground storage tanks (USTs) found at 40 Code of Federal Register (CFR) Part 280. 1.2 This guide does...