loading
DSF/ISO/FDIS 14097 - Greenhouse gas management and related activities – Framework including principles and requirements for assessing and reporting investments and financing activities related to climate change
DS

This document specifies a general framework, including principles, requirements and guidance for assessing and reporting investments and financing activities related to climate change. The assessment of these interactions includes the following items: - The risks...

NR/L3/INI/PG115/PS/015 - Planning and Programme Controls: Use of Earned Value Reporting in Investment Projects
December 4, 2010 - NR

This Network Rail standard specifies the process for using Earned Value on specified projects delivered within Investment Projects. This module is supported by two Guidance Note modules that outline the methodologies and the accepted approaches for the use of Earned Value within...

Investment Grade Energy Audit
January 1, 2004 - CRC

This book was written to give energy-involved professionals the tools they need to take their energy audits to the next level, and use them to accurately predict a building's future energy use and true savings potential. Going beyond the conventional energy audit, which can lead to...

NR/L3/INI/PG115/PS/017 - Planning and Programme Controls: Earned Value Reporting - Guidance on Set Up and Maintenance of Primavera Schedules
June 5, 2010 - NR

The Guidance Note details all the various parameters and settings that can be utilised within the Primavera application to set up and report Earned Value. This encompasses: a) administrative settings; b) project settings; c) user preferences; d) activity options; e)...

R&D Investment and Impact in the Global Construction Industry
June 11, 2014 - CRC

R&D Investment and Impact in the Global Construction Industry brings together contributions from leading industry researchers in a diverse group of countries to investigate the role of research and development (R&D) in the construction industry. Investment in R&D...

Electricity Markets: Investment Performance and Analysis
January 1, 1998 - WILEY

The impact of deregulation on the theory and practice of investment appraisal is addressed in this comprehensive treatment of the restructuring of the electricity supply industry. Demonstrating that the classical approach to generation investment appraisal is no longer...

Inspections and Reports on Dwellings: Reporting for Sellers
August 24, 2016 - CRC

Inspections and Reports on Dwellings is a series of four books, the first three of which have already been published to considerable success. This concluding book covers reports prepared before dwellings are put on the market for sale, whether as a legal requirement or on a...

NR/L3/INI/PG115/PS/016 - Planning and Programme Controls: Earned Value Reporting - Guidance on Definitions and Acceptable Practices
December 4, 2010 - NR

The Network Rail standard NR/L3/INI/PG115/PS/015 specifies the process for using Earned Value on projects delivered within the Network Rail Investment Projects group. This guidance note provides supporting supplementary information with regards to the acceptable approaches and methods...

DODD 3210.08 - REPORTING AND USING INFORMATION IN THE GOVERNMENT-WIDE INTEGRITY AND PERFORMANCE SYSTEM
October 15, 2018 - DOD

Purpose: In accordance with the authority in DoD Directive 5134.3 and DoD Directive 3210.06, this issuance: • Implements Office of Management and Budget (OMB) guidance in Parts 180 and 200 of Title 2, Code of Federal Regulations (CFR) for reporting and using...

Investment Casting
January 1, 1995 - MANEY

The process of investment casting has come to occupy a key position in the range of modern metal casting techniques. Over the half-century dating from 1940,what had been a small and highly specialised sector of casting activity developed into a worldwide and distinctive...

NR/L3/INI/PG115/BIS/002 - Planning & Programme Controls: Corporate KPIs - Generation of the IPI Measures for Investment Projects (Formerly NR/L3/INI/PG115/RC/002)
June 5, 2010 - NR

This Network Rail standard specifies a process to collect data and calculate IPI's within Investment Projects. This process specifies the data sources, key activities, processes and timeline to be utilised by the PDP and each Asset and Major Project to support the...

NEMA EWS 1.5 - US Water-Related Infrastructure Needs and Potential Funding Opportunities
January 1, 2016 - NEMA

The following tables contain the reported state and national investment needs for water supply and wastewater infrastructure. They also provide information on the major available funding programs found for projects that would address these needs. This information was...

NEMA GRID MOD R1 - Reviewing the Business Case and Cost Recovery for Grid Modernization Investments
January 1, 2018 - NEMA

Purpose Over the past decade or so, several utilities and commissions across the U.S. have made investments into new grid technologies, tools, and techniques to modernize the electric grid. As some of these investments are reaching full implementation, it is important...

NR/L3/INI/CP0068 - Investment Projects Forms Index
December 3, 2011 - NR

Forms define the necessary data to be captured and consistently presented to comply with the requirements of Network Rail standards. The standard incorporates an Index which contains details of all forms issued in support of standards contained within the investment Projects standards...

NG UKBP/TP 193 - UK Business Procedure/Transmission Procedures - Programme Management - Planning & Project Controls
August 1, 2016 - NG

PURPOSE AND SCOPE Transparent and accurate reporting of investment decisions, project performance and financial data is a Regulatory Requirement on National Grid. It is therefore subject to OFGEM audit, and can attract regulatory penalties if the required...

COMDTINST M3123.13 - OPERATIONAL REPORTING
April 17, 2014 - DOT

PURPOSE. To provide clear definitions, policy, and processes for reporting on Coast Guard operational activities as well as for the development and oversight of reporting processes.

NR/L3/INI/P3M/130/01 - Controls Manual: Earned Value Management
March 3, 2018 - NR

This module is to be applied by all Network Rail Delivery Agents whose projects have: a) been classified as LoC 1 and 2, see NR/L2/INI/P3M/101; and b) are post GRIP stage 4 (single option development); and c) have awarded the main contracts for the delivery of the project. By...

Advertisement