This specification covers brick intended for use in drainage structures for the conveyance of sewage, industrial wastes, and storm water, and related structures such as manholes and catch basins. The bricks are classified as sewer bricks (Grades SS and SM) and manhole bricks (Grades...
1.1 This practice covers proposed selection of materials, installation techniques, and inspection required for sealing manholes using chemical grout. Manholes or sections of manholes with active leaks shall be repaired. Manholes to be grouted are of brick, block,...
This specification covers products used in the assembly and construction of circular reinforced corrugated steel manholes for sewer and water works. Requirements are specified for the manufacture and purchase of: steel sheet for manhole structure(s) pipe, steel sheet for coupling...
This practice describes the procedures involved in the structural reinforcement, sealing, protection, and rehabilitation of sanitary sewer manholes by the application of a prepackaged protective cementitious liner system to all cleaned interior surface from the bottom of the frame to the...
1.1 This practice covers procedures for assessing the blockage within gravity-fed sewer pipes using transmissive acoustics for the purpose of prioritizing sewer pipe cleaning operations.2 The assessment is based on an acoustic receiver measuring the acoustic plane wave transmitted through the pipe...
This specification covers the manufacture and purchase requirements of products used for the assembly and construction of circular vertical precast reinforced concrete manholes and structures used in sewer and water works. Reinforced concrete shall consist of cementitious materials, mineral...
This specification covers the design, material, and minimum performance requirements for resilient connectors used to provide a positive seal between the pipe and manholes or other structures subjected to internal and external hydrostatic pressures less than 10.8 psi [74 KPa]. Testing under...
1.1 This specification covers solid precast segmental concrete masonry units made from hydraulic cement, water, and suitable mineral aggregates, with or without the inclusion of other materials. The units are intended for use in the construction of catch basins and manholes. 1.2 The text of...
4.1 Hydraulic cleaning methods include equipment that uses water and water velocity to clean the invert and walls of Thermoplastic Sewer Pipe. 4.2 The practice of high-velocity sewer cleaning is best described as a hydraulic cleaning method that uses water pressure to remove obstructions and...
1.1 This test method defines procedures for hydrostatic infiltration testing of new installations of vitrified clay pipe lines, to demonstrate the structural integrity of the installed line. Refer to Practice C12. 1.2 This test method is suitable for testing gravity-flow pipe lines constructed of...
This specification covers the design, material, and minimum performance requirements of resilient connectors used for connections between reinforced concrete manhole structures and corrugated high density polyethylene drainage pipes. These connectors are designed to provide a positive seal...
1.1 This practice covers the procedure for the post installation verification and acceptance of buried pipe deformation using a visible rotating laser light diode(s), a pipeline and conduit inspection analog or digital CCTV camera system and image processing software. The combination CCTV pipe...
1.1 This practice covers requirements for the cured-in-place rehabilitation of manholes without excavation, utilizing an inflatable bladder, and not limited to sanitary sewer manholes. 1.2 The values stated in inch-pound units are to be regarded as standard. The values given in...
4.1 Hydraulic cleaning methods include equipment that uses water and water velocity to clean the invert and walls of the vitrified clay sewer pipe. 4.2 The practice of high-velocity sewer cleaning is best described as a hydraulic cleaning method that uses water pressure to remove obstructions and...
This specification covers flexible watertight joints for concrete pipe and precast manhole sections, using rubber gaskets for sealing the joints, where infiltration or exfiltration is a factor in the design. The numerical values in this specification are not presented in inch-pound units,...
This specification covers flexible watertight joints for concrete pipe and precast manhole sections, using rubber gaskets for sealing the joints, where infiltration or exfiltration is a factor in the design. The numerical values in this specification are not presented in inch-pound units,...
1.1 This practice covers the procedures to be followed in the planning, site preparation, installation, testing and backfilling of underground vertical reinforced circular precast concrete manholes and components manufactured in accordance with Specification C478/C478M and used in sewer,...
1.1 This specification covers the minimum performance and material requirements for a three piece tee connector for connection between plastic pipe and insitu pipes, manholes and wastewater structures in sanitary and storm sewer applications. 1.1.1 The three piece seal system consists of a 4...
This specification covers the manufacture and purchase requirements of products used for the assembly and construction of circular vertical precast reinforced concrete manholes and structures used in sewer, drainage, and water works. Part I, Sections 1 - 11, of this specification presents...