loading
PCMCIA SYSTEM - PCMCIA SYSTEM ARCHITECTURE
PCMCIA
A description is not available for this item.
UL 1963 - Refrigerant Recovery/Recycling Equipment
June 1, 2011 - ULSE

019630-000000-000000 1 Scope 1.1 These requirements cover refrigerant recovery and recycling equipment to be employed in accordance with the National Electrical Code, NFPA 70 and include battery operated equipment. 1.2 These requirements apply to equipment intended for indoor or...

GMI R-5-4 - Water Recovery
December 1, 2007 - GME

Purpose Water recovery test of brake linings.

DNVGL-ST-E407 - Rope based deployment and recovery systems for designated service
September 1, 2019 - DNVGL

This standard covers rope based deployment and recovery systems that are integrated by defining the adequate acceptance criteria for delivery and the adequate designated service limits: - The deployment and recovery system shall meet the acceptance criteria at hand-over....

UL 2006 - Standard for Halon 1211 Recovery/Recharge Equipment
September 8, 2011 - ULSE

ul-2006.5 Halon 1211 Recovery/Recharge Equipment UL 2006 1 Scope 1.1 These requirements cover Halon 1211 recovery/recharge equipment rated 600 volts or less, and intended to be used in ordinary locations in accordance with the National Electrical Code, NFPA 70. 1.2 Halon 1211...

AHRI 740 - Performance Rating of Refrigerant Recovery Equipment and Recovery/Recycling Equipment
January 1, 2016 - AHRI

This standard applies to equipment for recovering and/or recycling, as per ASHRAE Standard 34, single refrigerants, azeotropes, zeotropic blends, and their normal contaminants from refrigerant systems. This standard defines the test apparatus, test gas mixtures, sampling procedures and...

UL 1815 - Nonducted Heat Recovery Ventilators
February 29, 2012 - ULSE

018150-000000-000000 1 Scope 1.1 These requirements cover nonducted, stationary or fixed heat recovery ventilators for household, commercial, or industrial use and intended to be employed in accordance with the National Electrical Code, ANSI/NFPA 70. 1.2 These requirements cover heat...

API PUBL 1645 - Stage II Vapor Recovery System Operations & System Installation Costs
August 1, 2002 - API

Stage II vapor recovery is a well-known air quality control measure that reduces ozone precursors from gasoline dispensing facilities (GDFs). As a result of its relative high-visual profile, Stage II vapor controls are sometimes proposed as a part of a regional air quality attainment...

DEF STAN 25-23 - Vehicle Recovery Facilities
January 1, 1994 - MODUK

This INTERIM Defence Standard specifies the characteristics of recovery eyes/lugs fitted to tracked and wheeled tactical land vehicles, armoured fighting vehicles, plant equipment, towed plant ant trailers to enable them to be recovered safely. It rationalizes on the sizes of recovery...

FORD FLTM BO 041-01 - STATIC INDENTATION AND RECOVERY
December 14, 2017 - FORD

Application This procedure is used to determine the recovery of soft interior composite systems after application of static load using an indenter.

UL 1812 - Ducted Heat Recovery Ventilators
May 3, 2013 - ULSE

018120-000000-000000 1 Scope 1.1 These requirements cover ducted heat recovery ventilators intended to remove air from buildings, replace it with outside air, and in the process transfer heat from the warmer to the colder air. These units are intended to be connected to duct systems...

UFGS-23 52 43.00 10 - HEAT RECOVERY BOILERS
April 1, 2008 - NASA

NOTE: This guide specification covers the requirements for both fire-tube and water-tube heat recovery, steam generating boilers with individual capacities from 907 to 136,000 kg 2,000 to 300,000 pounds of steam per hour.

AHRI GUIDELINE V SI - Calculating the Efficiency of Energy Recovery Ventilation and its Effect on Efficiency and Sizing of Building HVAC Systems
January 1, 2011 - AHRI

This guideline applies to energy recovery ventilation component applications and combinations of energy recovery components with unitary heating, ventilating, and air-conditioning equipment incorporating mechanical ventilation with outside air. This guideline applies only to energy...

DNVGL-CG-0042 - Cargo vapour recovery systems
July 1, 2019 - DNVGL

General This class guideline gives requirements for cargo vapour recovery systems required to be fitted for class notation VCS(3) and VCS(L, X%) according to DNV GL rules for classification: Ships DNVGL-RU-SHIP Pt.6 Ch.4 Sec.11 Cargo operations, on the following working principles: -...

GME R-5-4 - Water Recovery
December 1, 1996 - GME
A description is not available for this item.
DODD 2310.2 - PERSONNEL RECOVERY
DOD
A description is not available for this item.
ECMA 26 - RECOVERY PROCEDURES
ECMA
A description is not available for this item.
Active Directory Disaster Recovery
June 24, 2008 - PACKT

The book is a combined planning/response-focused book and can be read end to end but also is designed so that the second half can be read standalone, should disaster have struck already. This book is targeted at network security professionals who find themselves charged with creating an Active...

IETF RFC 4873 - GMPLS Segment Recovery
May 1, 2007 - IETF

This document describes protocol specific procedures for GMPLS (Generalized Multi-Protocol Label Switching) RSVP-TE (Resource ReserVation Protocol - Traffic Engineering) signaling extensions to support label switched path (LSP) segment protection and restoration. These extensions are intended to...

ASTM F2709-19 - Standard Test Method for Determining a Measured Nameplate Recovery Rate of Stationary Oil Skimmer Systems
August 1, 2019 - ASTM International

1.1 This test method defines a method and measurement criteria to quantify the performance of a stationary skimmer in ideal conditions in support of a device's nameplate recovery rate (capacity). If a determination of a skimmer's capabilities in realistic conditions (that is, advancing or...

Advertisement