UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/OPS/045/3.03

National Operating Procedure (NOP) 3.03: Preparation and Distribution of Blocked to Electric Trains (BTET) Instructions

active, Most Current
Buy Now
Organization: NR
Publication Date: 2 September 2017
Status: active
Page Count: 12
scope:

This procedure applies to:

  • BTET instructions being written for signallers and other operational staff on Network Rail managed infrastructure.
  • BTET instructions for any form of electrification (e.g. 25 kv overhead electrification, DC third rail electrification) on Network Rail managed infrastructure.
  • all Network Rail personnel who have a responsibility for preparing, approving, issuing, distributing or briefing of BTET instructions.
  • BTET instructions being supplied for operational staff of sections of railway that interface and / or are operated by third parties where the OHL is managed by Network Rail.

PURPOSE

To provide Network Rail with a process to make sure that Blocked To Electric Trains (BTET) instructions are prepared, authorised, published and briefed in a consistent manner across the network.

NOTE: Blocked To Electric Trains instructions are sometimes referred to as signaller's isolation instructions. For the purposes of clarity and to avoid confusion with electrical isolation instructions, they should be referred to as Blocked to Electric Trains instructions throughout this document.

Document History

NR/L3/OPS/045/3.03
September 2, 2017
National Operating Procedure (NOP) 3.03: Preparation and Distribution of Blocked to Electric Trains (BTET) Instructions
This procedure applies to: BTET instructions being written for signallers and other operational staff on Network Rail managed infrastructure. BTET instructions for any form of electrification (e.g....

References

Advertisement