NR/L3/OPS/045/3.10
National Operating Procedure (NOP) 3.10: Isolations, Loss of Power or Damage to Third Rail Equipment
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 2 September 2017 |
| Status: | active |
| Page Count: | 2 |
scope:
This procedure applies to Route Operations Control when dealing with incidents involving the third rail system and maintains the safety of the operational railway.
PURPOSE
This procedure allows Network Rail's Route Operations Control to safely deal with incidents affecting the third rail DC lines system.
Document History
NR/L3/OPS/045/3.10
September 2, 2017
National Operating Procedure (NOP) 3.10: Isolations, Loss of Power or Damage to Third Rail Equipment
This procedure applies to Route Operations Control when dealing with incidents involving the third rail system and maintains the safety of the operational railway.
PURPOSE
This procedure allows...