UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/OPS/045/3.10

National Operating Procedure (NOP) 3.10: Isolations, Loss of Power or Damage to Third Rail Equipment

active, Most Current
Buy Now
Organization: NR
Publication Date: 2 September 2017
Status: active
Page Count: 2
scope:

This procedure applies to Route Operations Control when dealing with incidents involving the third rail system and maintains the safety of the operational railway.

PURPOSE

This procedure allows Network Rail's Route Operations Control to safely deal with incidents affecting the third rail DC lines system.

Document History

NR/L3/OPS/045/3.10
September 2, 2017
National Operating Procedure (NOP) 3.10: Isolations, Loss of Power or Damage to Third Rail Equipment
This procedure applies to Route Operations Control when dealing with incidents involving the third rail system and maintains the safety of the operational railway. PURPOSE This procedure allows...

References

Advertisement