NR/L2/ELP/27715/MOD 06

Overhead Contact System Design Specification: Module 6 Governance of Overhead Contact System Design Ranges - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

active, Most Current
Buy Now
Organization: NR
Publication Date: 3 March 2018
Status: active
Page Count: 9
scope:

The module details requirements for the following features of the OCS basic design ranges:

• Management of drawings;

• Requirements for new drawings to be added to a range;

• Review and acceptance process;

• Interdependency with the product acceptance process and the Interim Statement of Verification (ISV);

• Roles and responsibilities;

• Process for assurance.

This module is applicable to all OCS Designers.

Purpose

This module specifies the requirements and processes involved in the creation and management of Overhead Contact System (OCS) basic design ranges to meet legislative requirements and to achieve safety, economy and performance when developing the principal features of an OCS.

This module provides a common strategy to demonstrate compliance and optimise the design of railway subsystems, but is not intended to reiterate legislation and governing standards.

 

Document History

Overhead Contact System Design Specification: Module 6 Governance of Overhead Contact System Design Ranges
The module details requirements for the following features of the OCS basic design ranges: • management of drawings; • requirements for new drawings to be added to a range; • review and acceptance...
NR/L2/ELP/27715/MOD 06
March 3, 2018
Overhead Contact System Design Specification: Module 6 Governance of Overhead Contact System Design Ranges - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
The module details requirements for the following features of the OCS basic design ranges: • Management of drawings; • Requirements for new drawings to be added to a range; • Review and acceptance...