UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR - TWI 2P034 ISSUE 1

How to Change a Steel Sleeper

inactive, Most Current
Organization: NR
Publication Date: 1 March 2005
Status: inactive
Page Count: 7
scope:

Introduction

This Track Work Instruction covers the removal and replacement of a steel sleeper.

Steel sleepers should not be replaced by concrete or timber, as this leads to maintenance problems, both top and alignment. See also separate instructions:

TWI 3P036 How to re-rail CWR

TWI 2P036 How to change a timber sleeper

TWI 2P043 How to change concrete sleeper

Document History

TWI 2P034 ISSUE 1
March 1, 2005
How to Change a Steel Sleeper
Introduction This Track Work Instruction covers the removal and replacement of a steel sleeper. Steel sleepers should not be replaced by concrete or timber, as this leads to maintenance problems,...

References

Advertisement