NR TWI 2G041
How to Install a Temporary Joint
| Organization: | NR |
| Publication Date: | 1 March 2005 |
| Status: | active |
| Page Count: | 4 |
scope:
Introduction
This Track Work Instruction covers how to install a temporary joint. You may need to do this if you are not able to fully complete your work and need to open a line to traffic. Although you may have to open the line at a reduced speed, you will avoid the serious delays that would occur with a blocked line.
See also separate instructions:
TWI 2C037 How to carry out rail adjusting/pulling back rails
TWI 2G010 How to use a rail saw
TWI 2G011 How to use a rail drill
TWI 2G037 How to install Emergency clamped fishplates
TWI 2G043 How to carry out disc cutting rail
TWI 2S032 How to install a closure rail