NR TWI 2G056

How to Dig a Cutter Bar Trench

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 March 2005
Status: active
Page Count: 3
scope:

Introduction

This Track Work Instruction covers the excavation of a cutter bar trench prior to ballast cleaning. It is assumed that the line is re-opened after the trench is dug.

See also separate instructions:

TWI 2B004 How to regulate ballast by hand

TWI 2B007 How to dig out contaminated ballast 

Document History

NR TWI 2G056
March 1, 2005
How to Dig a Cutter Bar Trench
Introduction This Track Work Instruction covers the excavation of a cutter bar trench prior to ballast cleaning. It is assumed that the line is re-opened after the trench is dug. See also separate...