NR TWI 2S033

How to Carry out a Complete Treatment of Switches on Timber Bearers

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 June 2014
Status: active
Page Count: 32
scope:

Introduction

This track work information sheet explains how to carry out a Complete Treatment of S&C on timber bearers. It covers:

• A full scope to identify the work including checking the line, top and gauge of switches

• Identification of associated works

• Tightening and replacing bolts

• Datum rail alignment

• Stock rail squaring

• Re-gauging

• Replacement of all fastenings, screws and ferrules

• Correction of top through the switch

This task involves P-Way and S&T forming a multi-discipline team, especially when reconnecting point operating equipment.

See also: Appendix A for scoping document for Complete Treatment Appendix B for TEF 3239 dimensions It does not include adjusting the squareness of the switch toes.

If the toes are found to be out of alignment during the scope, this shall be rectified before this task can carried out.

 

Document History

NR TWI 2S033
June 1, 2014
How to Carry out a Complete Treatment of Switches on Timber Bearers
Introduction This track work information sheet explains how to carry out a Complete Treatment of S&C on timber bearers. It covers: • A full scope to identify the work including checking the line,...