NR TWI 3L002
How to Manage Developing Cutting Failure
| Organization: | NR |
| Publication Date: | 1 March 2005 |
| Status: | active |
| Page Count: | 2 |
scope:
Introduction
This Track Work Instruction covers managing and monitoring a possible failure of a cutting slope.
See also separate instructions:
- TWI 2G019 How to apply a speed restriction in an emergency
- TWI 3G044 How to manage a watchman
- TWI 3G083 How to decide on whether to use a watchman
- TWI 3G111 How to arrange an emergency temporary speed restriction
- TWI 3L003 How to manage a developing embankment slip.
Look at the top and line of the track at the cutting toe - if there is any sign of the track heaving up then report back immediately. This is a sign of a slip circle developing which can lead to a serious failure of not only the cutting face but also the track.
Document History