UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR TWI 3P071

How to Change a Defective Rail on a Heavily Sideworn Curve

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 March 2005
Status: active
Page Count: 2
scope:

Introduction

This Track Work Instruction covers the situation where there is heavy sidewear and a need to replace a short piece of rail - such as between points 'A' and 'B' in the photograph. This could happen if it was necessary to remove a rail defect or replace an IBJ. This will require the railhead profile of the new rail to be 'blended' to that of the existing rail. A B

See also the separate instructions:

 TWI 3G055 How to carry out reprofiling of the railhead

TWI 3G123 Use and maintenance of small plant

Document History

NR TWI 3P071
March 1, 2005
How to Change a Defective Rail on a Heavily Sideworn Curve
Introduction This Track Work Instruction covers the situation where there is heavy sidewear and a need to replace a short piece of rail - such as between points ’A’ and ‘B’ in the photograph. This...

References

Advertisement