NR/L2/SIG/11201/MOD A2-23
Signalling Design Handbook: Recovery of Redundant Assets
| Organization: | NR |
| Publication Date: | 2 June 2018 |
| Status: | active |
| Page Count: | 11 |
scope:
The module covers:
a) the production process;
b) approval and contents of a signalling design specification;
c) design specifications required for each stage of the signalling production process from feasibility through to detailed design.
Purpose
This module specifies the requirements to include in signalling design specifications. This informs the designer of the required outputs of the signalling design so it meets the client's project specification requirements
Document History