UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/SIG/11201/MOD A3-2

Signalling Design Handbook: Project Requirements for Signalling Schemes

active, Most Current
Buy Now
Organization: NR
Publication Date: 2 June 2018
Status: active
Page Count: 14
scope:

This module applies to all proposals for new and altered signalling works irrespective of size.

Purpose

This module gives guidance on documenting the essential features of proposed signalling works and notifying them to designers responsible for the delivery of the scheme documentation.

Project requirements have previously been documented in a variety of named documents: Outline Project Specification (OPS), Final Project Specification (FPS), Project Requirements Specification (PRS) and more recently Route Requirement Document (RRD) and Detailed Route Requirements Document (DRRD), refer to NR/L3/INI/P3M/126

In this module the general term projects specification has been used for the document(s) that captures the required information required by the designer responsible for delivering the design (in whichever phase of a project).

Document History

NR/L2/SIG/11201/MOD A3-2
June 2, 2018
Signalling Design Handbook: Project Requirements for Signalling Schemes
This module applies to all proposals for new and altered signalling works irrespective of size. Purpose This module gives guidance on documenting the essential features of proposed signalling works...

References

Advertisement