NR/L3/ELP/27240/NR/C16H
Isolation and Earthing at Hackney Downs No 2 Track Sectioning Cabin
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 2 March 2019 |
| Status: | active |
| Page Count: | 9 |
scope:
Includes: The following instructions apply only to the 25kV Hackney Downs No. 2 TSC in connection with the issue and cancellation of High Voltage Permits to Work or Sanctions for Test, to enable work/testing to be carried out on this equipment or the connections thereto.
Excludes: All other 25kV switching stations
Document History
NR/L3/ELP/27240/NR/C16H
March 2, 2019
Isolation and Earthing at Hackney Downs No 2 Track Sectioning Cabin
Includes: The following instructions apply only to the 25kV Hackney Downs No. 2 TSC in connection with the issue and cancellation of High Voltage Permits to Work or Sanctions for Test, to enable...