NR/L3/ELP/27240/NR/C16E

Isolating and earthing structure mounted outdoor switchgear (SMOS) locations (where working instructions for 25 kV electrified lines NR/SP/ELP/29987 apply)

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 March 2017
Status: active
Page Count: 8
scope:

Includes: This document applies to SMOS locations where the O.L.E. equipment is registered from the SMOS supporting structures or where adjacent O.L.E. equipment requires to be isolated and earthed to allow work to be carried out.

Document History

NR/L3/ELP/27240/NR/C16E
March 1, 2017
Isolating and earthing structure mounted outdoor switchgear (SMOS) locations (where working instructions for 25 kV electrified lines NR/SP/ELP/29987 apply)
Includes: This document applies to SMOS locations where the O.L.E. equipment is registered from the SMOS supporting structures or where adjacent O.L.E. equipment requires to be isolated and earthed...

References