NR/L3/ELP/27240/NR/C10MA
Routine Inspection and Secondary Injection Testing of LFZP 141 Optimho Relay Using ORTS 50 Test Set (For K11 Locations refer to NR/DIST C10a)
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 1 March 2017 |
| Status: | active |
| Page Count: | 4 |
scope:
Includes: LFZP 141 Optimho distance protection relay
Excludes: Locations with K11 25kV switchgear
Document History
NR/L3/ELP/27240/NR/C10MA
March 1, 2017
Routine Inspection and Secondary Injection Testing of LFZP 141 Optimho Relay Using ORTS 50 Test Set (For K11 Locations refer to NR/DIST C10a)
Includes: LFZP 141 Optimho distance protection relay
Excludes: Locations with K11 25kV switchgear