NR/L3/ELP/27240/NR/D28A
Routine Inspection and Testing of Earth Electrodes / Earth Mats at Substations and other Supply Points
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 1 March 2017 |
| Status: | active |
| Page Count: | 8 |
scope:
Includes: This instruction details the inspection and testing of Earth Electrodes and Mats at Substations and other supply points on DC Electrified lines.
Document History
NR/L3/ELP/27240/NR/D28A
March 1, 2017
Routine Inspection and Testing of Earth Electrodes / Earth Mats at Substations and other Supply Points
Includes: This instruction details the inspection and testing of Earth Electrodes and Mats at Substations and other supply points on DC Electrified lines.