NR/SIN/185
Identification and Inspection of Plain-Lined S&C
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 23 March 2019 |
| Status: | active |
| Page Count: | 17 |
scope:
The purpose of this SIN is to identify all plain-lined Switches & Crossings (S&C) sites within the network, as well as which route of the S&C has been plain-lined. A risk classification will be applied to all plain-lined sites. A risk management plan will be produced for all sites included within the Track Risk Register.
Document History
NR/SIN/185
March 23, 2019
Identification and Inspection of Plain-Lined S&C
The purpose of this SIN is to identify all plain-lined Switches & Crossings (S&C) sites
within the network, as well as which route of the S&C has been plain-lined. A risk
classification will be...