UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/ELP/25000/MOD05

Electrical Safety Measures for Working on the Operational Railway with Overhead Electrification (Trial Areas Only): Site Control Measures to Establish the Electrical Safe System of Work

active, Most Current
Buy Now
Organization: NR
Publication Date: 7 September 2019
Status: active
Page Count: 17
scope:

This module applies only in areas undertaking the trial of the Single Approach to Isolations on 25 kV a.c. infrastructure as set out in the Scope of the main standard. Within the trial areas, this standard supersedes all the requirements of NR/L3/ELP/29987. For all areas not involved in that trial, this standard does not apply and the provisions of the most recent issue of NR/L3/ELP/29987 apply instead.

Within the trial area, this module details the assessment, selection and implementation of site control measures when work is to be carried out on the operational railway with 25 kV a.c. electrification for the purpose of setting up an Electrical Safe System of Work.

This module applies to Network Rail personnel and to Network Rail's contractors working within the trial areas, when working on the operational railway with overhead electrification or when working off the operational railway but where the work presents the risk of encroaching within 2.75 m of exposed Live parts.

To provide a consistent approach for working and managing the interfaces between systems and parties, other Railway Group members may, as best practice, apply this module to infrastructure that they control within or adjacent to the trial area.

Further requirements are contained in the Rule Book module AC (GE/RT8000/AC) and Handbook 16 (GE/RT8000/HB16), and in Network Rail's Lifesaving Rules.

Document History

NR/L3/ELP/25000/MOD05
September 7, 2019
Electrical Safety Measures for Working on the Operational Railway with Overhead Electrification (Trial Areas Only): Site Control Measures to Establish the Electrical Safe System of Work
This module applies only in areas undertaking the trial of the Single Approach to Isolations on 25 kV a.c. infrastructure as set out in the Scope of the main standard. Within the trial areas, this...

References

Advertisement