NR/L3/ELP/27240/NR/D/C26N
Routine Testing of D.C. Frame Leakage Protection - Balfour Beatty GE-Rapid
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 5 December 2020 |
| Status: | active |
| Page Count: | 6 |
scope:
Includes: This instruction describes how to test D.C. frame leakage protection installed on Balfour Beatty GE-RAPID switchboards using the DCP116
protection relay. It follows the methodology that tests stage 1 and stage 2 separately however a single test may be undertaken if agreement is
reached with the ECR.
Excludes: All other types of frame leakage protection
Document History
NR/L3/ELP/27240/NR/D/C26N
December 5, 2020
Routine Testing of D.C. Frame Leakage Protection - Balfour Beatty GE-Rapid
Includes: This instruction describes how to test D.C. frame leakage protection installed on Balfour Beatty GE-RAPID switchboards using the DCP116
protection relay. It follows the methodology that...