UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/ELP/27240/NR/D/C26P

Routine Testing of D.C. Frame Leakage Protection - Siemens 8MF94 First Generation

active, Most Current
Buy Now
Organization: NR
Publication Date: 5 December 2020
Status: active
Page Count: 6
scope:

Includes: This instruction describes how to test D.C. frame leakage protection installed on Siemens 8MF94 1st generation switchboards. These

switchboards are fitted with second stage frame leakage. It follows the existing work instruction methodology that tests stage 1 and stage 2

separately however a single test may be undertaken if agreement is reached with the ECR.

Excludes: All other types of frame leakage protection

Document History

NR/L3/ELP/27240/NR/D/C26P
December 5, 2020
Routine Testing of D.C. Frame Leakage Protection - Siemens 8MF94 First Generation
Includes: This instruction describes how to test D.C. frame leakage protection installed on Siemens 8MF94 1st generation switchboards. These switchboards are fitted with second stage frame leakage....

References

Advertisement