NR/L3/ELP/27240/NR/D/C26Q
Routine Testing of D.C. Frame Leakage Protection - Hawker Sidderley Switchgear NDC4
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 5 December 2020 |
| Status: | active |
| Page Count: | 5 |
scope:
Includes: This instruction describes how to test D.C. frame leakage protection installed on Hawker Sidderley Switchgear (HSS) NDC4 switchboards.
These switchboards do not require and are not fitted with second stage frame leakage.
Excludes: All other types of frame leakage protection
Document History
NR/L3/ELP/27240/NR/D/C26Q
December 5, 2020
Routine Testing of D.C. Frame Leakage Protection - Hawker Sidderley Switchgear NDC4
Includes: This instruction describes how to test D.C. frame leakage protection installed on Hawker Sidderley Switchgear (HSS) NDC4 switchboards.
These switchboards do not require and are not fitted...