NR/L3/ELP/27240/NR/D/C34A

Isolation of the Ludgate Cellars Substation AC/DC Interface DC Contactor Suites

active, Most Current
Buy Now
Organization: NR
Publication Date: 5 December 2020
Status: active
Page Count: 6
scope:

Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of Certificate of Isolation to place the

D.C. contactor suite into maintenance mode to enable work / testing to be carried out.

Excludes: These do not include the methodology of isolating the Trackside Slave Contactors (TSC) at Blackfriars station, that are associated with the main

D.C. contactor suites.

Document History

NR/L3/ELP/27240/NR/D/C34A
December 5, 2020
Isolation of the Ludgate Cellars Substation AC/DC Interface DC Contactor Suites
Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of Certificate of Isolation to place the D.C. contactor suite into maintenance mode...