UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/ELP/27240/NR/D/C34G

Isolation of DC Voltage Monitoring Panels Installed at Ludgate Cellars Substation

active, Most Current
Buy Now
Organization: NR
Publication Date: 5 December 2020
Status: active
Page Count: 4
scope:

Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of Certificate of Isolation for the DC

Voltage Monitoring (VM) panels installed at Ludgate Cellars substation (see figure 1) to enable maintenance work / testing to be carried out.

Excludes: These instructions do not include the methodology of isolating the other equipment associated with the AC/DC interface at Ludgate Cellars

Substation, such as the main DC contactor suites, or the Trackside Slave Contactors (TSC).

Document History

NR/L3/ELP/27240/NR/D/C34G
December 5, 2020
Isolation of DC Voltage Monitoring Panels Installed at Ludgate Cellars Substation
Includes: This document sets out the instructions to be carried out in connection with the issue and cancellation of Certificate of Isolation for the DC Voltage Monitoring (VM) panels installed at...

References

Advertisement