UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/INI/TK0027

Excavation and Ballast as Built (aka NR/L3/INI/TK0027)

active, Most Current
Buy Now
Organization: NR
Publication Date: 6 March 2021
Status: active
Page Count: 19
scope:

This document applies to all enhancement, renewals or heavy refurbishment works where the specified work disturbs the track bed layers, formation and/or re-ballasting is specified.

Purpose

This document sets out the requirements and process for measuring and recording hidden works including the excavation and reinstatement of track bed layers and the installation of geosynthetics compliance to Network Rail standards, Site Particular Specifications and the Contract Technical Specification (or equivalent). This document controls the risk of inadequately or incorrectly recording hidden works.

Document History

NR/L3/INI/TK0027
March 6, 2021
Excavation and Ballast as Built (aka NR/L3/INI/TK0027)
This document applies to all enhancement, renewals or heavy refurbishment works where the specified work disturbs the track bed layers, formation and/or re-ballasting is specified. Purpose This...
June 1, 2008
Test & Inspection Plan
The procedure shall apply to all track renewals work where Trax re-ballasting, or Trax formation works has been specified as a works deliverable. PURPOSE This document defines the procedures that...
January 19, 2006
Test & Inspection Plan
The procedure shall apply to all track renewals work where Trax re-ballasting, or Trax formation works has been specified as a works deliverable. PURPOSE This document defines the procedures that...

References

Advertisement