UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NAVY - OPNAV F3501.407

(N98) REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET LOGISTICS SUPPORT MULTI-MISSION SQUADRON FIVE ZERO FLEET REPLACEMENT SQUADRON

active, Most Current
Organization: NAVY
Publication Date: 17 March 2021
Status: active
Page Count: 19
scope:

Scope and Applicability.

Enclosures (1) and (2) have been prepared per references (a) through (c). The ROC and POE provide the necessary details to describe the mission areas, environment and operational capabilities for which VRM-50 FRS is configured. This instruction provides resource sponsors and agencies with information concerning VRM-50 FRS mission requirements, capabilities, as well the types and locations of expected operations. Together, the ROC and POE establish tasking which produces measurable workload used by the Navy Manpower Analysis Center to compute manpower requirements for VRM-50 FRS manpower document.

Purpose.

To issue the revised Required Operational Capabilities (ROC) and Projected Operational Environment (POE) for Fleet Logistics Support Multi-Mission Squadron FIVE ZERO (VRM-50) Fleet Replacement Squadron (FRS). This instruction is a complete revision and should be reviewed in its entirety.

Document History

OPNAV F3501.407
March 17, 2021
(N98) REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET LOGISTICS SUPPORT MULTI-MISSION SQUADRON FIVE ZERO FLEET REPLACEMENT SQUADRON
Scope and Applicability. Enclosures (1) and (2) have been prepared per references (a) through (c). The ROC and POE provide the necessary details to describe the mission areas, environment and...

References

Advertisement