NR/L3/SIG/11235/G210 ISSUE 1
Signal Maintenance Testing Handbook: Production and Acceptance of G130 Test Plans, and Acceptance of Associated G120 Test Schedules
| Organization: | NR |
| Publication Date: | 4 September 2021 |
| Status: | active |
| Page Count: | 15 |
scope:
This module applies to Functionally Equivalent Works that meet the selection criteria as define in NR/L3/SIG/10064 NR/GI/T001, where a new G130 Test Plan is required.
Purpose
This module is part of the suite of documents contained within the Signalling Intermediate Testing
Handbook, NR/L3/SIG/11235, which together detail the requirements for signalling intermediate testing activities.
This module, in support of NR/L2/SIG/11235/G110
• Production of a new G130 Test Plan; and
• Acceptance by Network Rail of a new G130 Test Plan by Network Rail; and
• Acceptance by Network Rail of a G120 Test Schedule for the Functionally Equivalent Works that requires a New G130 Test Plan;
before testing on Network Rail signalling infrastructure can proceed in accordance with that new G130 Test Plan and the associated G120 Test Schedule.