UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/TRK/7014/02 ISSUE 1

Standardised Risk Based Maintenance Regime (RBM) for the Inspection and Maintenance of the Permanent Way: General Requirements for all Track Systems

active, Most Current
Organization: NR
Publication Date: 5 March 2022
Status: active
Page Count: 15
scope:

This module of NR/L2/TRK/7014:

a)  track quality management;

b)  cab riding;

c)  RBM Inspection and scoping;

d)  temporary works; and

e)  special arrangements that are common across many construction types.

This module applies to those who are planning and managing the inspection and maintenance of track under standardised RBM regimes.

This module does not cover:

a)  implementation and assurance processes;

b)  track geometry management;

c)  frequency of inspection for specific assets; or

d)  intervention limits for defects.

Document History

NR/L2/TRK/7014/02 ISSUE 1
March 5, 2022
Standardised Risk Based Maintenance Regime (RBM) for the Inspection and Maintenance of the Permanent Way: General Requirements for all Track Systems
This module of NR/L2/TRK/7014: a)  track quality management; b)  cab riding; c)  RBM Inspection and scoping; d)  temporary works; and e)  special arrangements that are common across many...

References

Advertisement