BSI - BS EN 15632-3 - TC
Tracked Changes (Redline) - District heating pipes - Factory made flexible pipe systems - Part 3: Non bonded system with plastic service pipes; requirements and test methods
active, Most Current
| Organization: | BSI |
| Publication Date: | 30 June 2022 |
| Status: | active |
| Page Count: | 46 |
| ICS Code (Pipelines and its parts for district heat): | 23.040.07 |
Document History
BS EN 15632-3 - TC
June 30, 2022
Tracked Changes (Redline) - District heating pipes - Factory made flexible pipe systems - Part 3: Non bonded system with plastic service pipes; requirements and test methods
A description is not available for this item.