NR/L2/OHS/00130/03 ISSUE 2
Creating a Site of Work Segregated from the Railway: Within a Possession
| Organization: | NR |
| Publication Date: | 3 June 2023 |
| Status: | active |
| Page Count: | 12 |
scope:
This module applies to a site of work designated as being segregated from the railway within a possession and it covers two scenarios:
Scenario 1: construction of a new railway line (or other engineering works that will connect with the operational railway)
Scenario 2: construction works taking place within a possession and or siding possession where temporary segregation from open lines can be established.
Purpose
This module provides risk-based controls for works being undertaken within a possession, where temporary segregation from open lines can be established so that:
a) risk to the operational railway is eliminated or reduced to so far as is reasonably practicable;
b) once the site of work designated as segregated from the railway is in place, the requirements of NR/L2/OHS/019 do not apply and non-PTS operatives can be used.
NOTE: All other relevant Network Rail standards apply.