DI-EMCS-81849A

PRODUCTION-LEVEL MISSION CRITICAL SYSTEMS (MCS) IMMUNITY TEST (PMIT) REPORT

active, Most Current
Publication Date: 20 March 2023
Status: active
Page Count: 5
scope:

A general description of the overall test-requirements matrix that was used to verify the MCS's compliance with MIL-STD-3023A's performance requirements, and an associated listing of the test results. Also, a description of the relative roles of tests, inspections, and analyses shall be provided.

The following topics shall be included:

a. Synopsis of the PMIT test procedures performed (as applicable), and references to detailed procedures

b. Pass or failure performance results with respect to all requirements

c. Anticipated impact of any failures

d. Recommendations to resolve any failures

e. Lessons learned for the MCS's hardness and testability

Document History

DI-EMCS-81849A
March 20, 2023
PRODUCTION-LEVEL MISSION CRITICAL SYSTEMS (MCS) IMMUNITY TEST (PMIT) REPORT
A general description of the overall test-requirements matrix that was used to verify the MCS’s compliance with MIL-STD-3023A’s performance requirements, and an associated listing of the test...
November 28, 2011
TEST REPORT FOR PRODUCTION-LEVEL MCS (MISSION CRITICAL SUBSYSTEM) IMMUNITY TEST (PMIT)
Use/relationship: The Test Report for MIL-STD-3023 Immunity Production MCS (Mission Critical Subsystem) Test (PMIT) will be used to obtain essential information from contractors after they perform...

References

Advertisement