UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ATIS 0300014

Next Generation Interconnection Interoperability (NGIIF) Reference Document: Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment C SCCP Compatibility Tests

active, Most Current
Buy Now
Organization: ATIS
Publication Date: 1 December 2011
Status: active
Page Count: 21
scope:

INTRODUCTION AND TESTING ENVIRONMENT

The following tests were developed by the NGIIF/SS7 Ad hoc Committee to verify the compatibility of networks during interconnection. These tests are intended to be used as a set of minimum tests of the SCCP protocol portion of the network service part for connectionless services only (Class 0).

It is assumed that the interconnecting networks may have some additional tests they may wish to perform during interconnection. In that case, these tests will be part of the bilateral agreements developed for SS7 network interconnection.

Schematics included with the test scripts indicate a minimum network configuration. The actual test network may include intermediate STPs.

Document History

ATIS 0300014
December 1, 2011
Next Generation Interconnection Interoperability (NGIIF) Reference Document: Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment C SCCP Compatibility Tests
INTRODUCTION AND TESTING ENVIRONMENT The following tests were developed by the NGIIF/SS7 Ad hoc Committee to verify the compatibility of networks during interconnection. These tests are intended to...
June 1, 2009
Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment C SCCP Compatibility Tests
A description is not available for this item.
February 1, 2009
Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment C SCCP Compatibility Tests
INTRODUCTION AND TESTING ENVIRONMENT The following tests were developed by the NIIF/SS7 Ad hoc Committee to verify the compatibility of networks during interconnection. These tests are intended to...
January 1, 2008
Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment C SCCP Compatibility Tests
A description is not available for this item.

References

Advertisement