IEC - TS 63222-2

Power quality management – Part 2: Power Quality Monitoring System

active, Most Current
Organization: IEC
Publication Date: 1 October 2023
Status: active
Page Count: 30
ICS Code (Electrical engineering in general): 29.020
scope:

This part of IEC 63222 defines technical requirements for designing a power quality monitoring system for public power supply networks. It is applicable for LV, MV and HV public power supply networks.

The design procedure of a power quality monitoring system (PQMS) generally includes the following four steps:

• Step 1: purpose and application analysis 

Analyse power quality monitoring (PQM) demand and define the purpose of PQM.

• Step 2: preliminary study 

Collect background information such as network configuration, the parameters of instrument transformers, e.g. the output levels and performance capabilities, attributes of loads or distributed generations (DG), communication conditions, budgets, and other restrictive conditions, and select the parameters to be monitored and monitoring sites according to corresponding principles.

• Step 3: system structure design 

Design the overall structure of the monitoring system according to the monitoring purpose based on the analysis of the advantages and disadvantages of various system structures.

• Step 4: detailed design of functional modules 

Design the function modules of data collection, communication, data storage, data processing and analysis in detail according to the functional requirements.

This document defines the main purposes of PQM and gives recommendations for preliminary study, such as how to select monitoring sites and monitoring parameters and whether the instrument transformer is suitable for monitoring. This document also classifies the PQMS structure and specifies the functional requirements of the modules such as data collection, communication, data storage, data processing and analysis.

Document History

TS 63222-2
October 1, 2023
Power quality management – Part 2: Power Quality Monitoring System
This part of IEC 63222 defines technical requirements for designing a power quality monitoring system for public power supply networks. It is applicable for LV, MV and HV public power supply...