NR/L3/SIGELP/50001/SPS M001 ISSUE 5
Signalling Power Distribution Equipment Above 175 V AC (Work Instructions): FSP and Cabling Maintenance (Signalling Power Distribution Equipment above 175 V AC)
| Organization: | NR |
| Publication Date: | 2 December 2023 |
| Status: | active |
| Page Count: | 13 |
scope:
Includes:
Any FSPs or signalling equipment housings (REBs, relay rooms, location cases, apparatus cases, battery cases, relay cabinets, equipment cupboards, stump boxes, power pillars) containing signalling power distribution equipment above 175 V AC.
Excludes:
Signalling equipment housings with no signalling power distribution equipment above 175 V AC. PSP equipment such as UPS, diesel generators, change-over panels and PSP transformers.
Document History