UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/ELP/SAI25/01 ISSUE 2

Working On or About Overhead Line Equipment (SAI): General Requirements

active, Most Current
Organization: NR
Publication Date: 2 December 2023
Status: active
Page Count: 16
scope:

This module states the general requirements for working on or about Overhead Line Equipment including responsibilities, a description of the electrification systems, the danger that can arise from live overhead line equipment and how to communicate with the Electrical Control Operator (ECO).

It is applicable to Network Rail personnel and to Network Rail's contractors.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This module also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation a Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area - Module Z). 

Purpose

This module supports a consistent understanding of working on or about Overhead Line Equipment.

NOTE: Further requirements for working on or about the electrified lines and for communication are contained in the Rule Book Modules AC, HB16 and G1 (GE/RT8000/AC, GE/RT8000/HB16 and GE/RT8000/G1). 

Document History

NR/L3/ELP/SAI25/01 ISSUE 2
December 2, 2023
Working On or About Overhead Line Equipment (SAI): General Requirements
This module states the general requirements for working on or about Overhead Line Equipment including responsibilities, a description of the electrification systems, the danger that can arise from...
Working On or About Overhead Line Equipment (SAI): General Requirements - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
This module states the general requirements for working on or about Overhead Line Equipment including responsibilities, a description of the electrification systems, the danger that can arise from...

References

Advertisement