NR/L3/SIG/11303/2U05

Signalling Installation - Train Warning and Protection Systems: Automatic Warning System (AWS)

active, Most Current
Buy Now
Organization: NR
Publication Date: 4 December 2010
Status: active
Page Count: 13
scope:

General

Inductors need to be installed in an approved manner, and in the positions specified on signalling layout plans.

An inductor should be installed not less than three sleeper beds from any fishplated rail joint.

Typical inductor layouts are shown in Figures 1 and 2. A parts list is given in Table 1 at the end of this module.

Arrangements for fitting to UIC60 rail are not yet available. Ask your supervisor for details.

Document History

NR/L3/SIG/11303/2U05
December 4, 2010
Signalling Installation - Train Warning and Protection Systems: Automatic Warning System (AWS)
General Inductors need to be installed in an approved manner, and in the positions specified on signalling layout plans. An inductor should be installed not less than three sleeper beds from any...

References

Advertisement