UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/SIG/11303/2S20

Signalling Installation - Points: Detection

active, Most Current
Buy Now
Organization: NR
Publication Date: 4 September 2010
Status: active
Page Count: 12
scope:

Introduction

Point switch rails need to have moved fully to their correct positions before signalled movements are allowed over them. Detection is the means of checking if the points are in the right position. If the points are facing points, then the detection also checks that they have been locked in that correct position.

Where signals are mechanically operated, it is often convenient to have mechanical detection in series with the signal wire, but most installations nowadays are electrical, and this form of detection will be dealt with in this module.

Document History

NR/L3/SIG/11303/2S20
September 4, 2010
Signalling Installation - Points: Detection
Introduction Point switch rails need to have moved fully to their correct positions before signalled movements are allowed over them. Detection is the means of checking if the points are in the...

References

Advertisement