NR/WI/ELP/27114

Work instruction for carrying out testing on all electrified lines

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 December 2005
Status: active
Page Count: 8
scope:

This document covers all testing as defined by the following detail:

System performance tests.

Short circuit tests.

Section proving on new systems and following system alterations.

Running of Mentor or equivalent measurement vehicle.

Running of the Load Bank.

Any other testing that requires the non-routine connection to or alteration of the Overhead Line or Conductor Rail System.

Purpose

This document sets out the requirements for carrying out testing of electrification systems and equipment.

Document History

NR/WI/ELP/27114
December 1, 2005
Work instruction for carrying out testing on all electrified lines
This document covers all testing as defined by the following detail: System performance tests. Short circuit tests. Section proving on new systems and following system alterations. Running of...
December 4, 2004
Instructions for the Carrying Out of Testing on All Electrified Lines
This document is to cover all testing as defined by the following detail: System performance tests. Short circuit tests. Section proving on new systems and following system alterations. Running...