UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR SAO-IEC-HP-15

Integrated Electronic Control Centre Project Handbook IECC 8005 Timescale Planning

active, Most Current
Buy Now
Organization: NR
Publication Date: 29 October 1999
Status: active
Page Count: 22
scope:

PURPOSE AND SCOPE OF DOCUMENT

The purpose of this document is to provide the information that a project engineer needs for planning the IECC part of a resignalling scheme.

It is assumed that SSI is part of the scheme and the relevant SSI tasks are shown where they have key dependencies with IECC tasks. The documents referenced from the SSI Applications Manua[1l] must be used to make detailed plans for the SSI work and it is not intended to supplant these documents.

The main exclusions are the trackside signalling work and any civil engineering or permanent way works involved as these are outside of the scope of this guide.

Document History

NR SAO-IEC-HP-15
October 29, 1999
Integrated Electronic Control Centre Project Handbook IECC 8005 Timescale Planning
PURPOSE AND SCOPE OF DOCUMENT The purpose of this document is to provide the information that a project engineer needs for planning the IECC part of a resignalling scheme. It is assumed that SSI is...

References

Advertisement