UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/SP/ELP/21107

Bolted Running Rail Connections for Traction Bonding on AC and DC Electrified Lines

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 April 2006
Status: active
Page Count: 15
scope:

This specification applies to all new bolted rail connections for bonds which carry traction current installed on the A.C. and D.C. Electrified Lines.

Welded or brazed connections are excluded from this specification.

Purpose

This specification states the requirements for the design, manufacture and testing of bolted electrical connections for attachment to running rails. The connections are used for:

a) traction bonding;

b) signal track circuit connections.

Document History

NR/SP/ELP/21107
April 1, 2006
Bolted Running Rail Connections for Traction Bonding on AC and DC Electrified Lines
This specification applies to all new bolted rail connections for bonds which carry traction current installed on the A.C. and D.C. Electrified Lines. Welded or brazed connections are excluded from...
March 1, 1998
Bolted Running Rail Connections for Traction Bonding on AC and DC Electrified Lines
This specification applies to all new bolted rail connections for bonds which carry traction current installed on the A.C. and D.C. Electrified Lines. Welded or brazed connections are excluded from...