UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/FP C300

Plant & Equipment Work Instructions: Unmanned Lineside Building Services

active, Most Current
Buy Now
Organization: NR
Publication Date: 3 September 2011
Status: active
Page Count: 4
scope:

General

a) Check that any high/low temperature readings in the building are within tolerance.

b) Check all units for damage, security, cleanliness and correct operation in all modes.

c) Check that any air flows are not restricted by litter or vegetation and that heating/cooling coils are clean.

d) Wash, dry and replace or renew air filters as appropriate.

e) Check that the temperature settings are correct

f) Check that condensate pan and drain are clear and properly attached.

g) Check for any undue noise or vibration from rotating components.

Document History

NR/FP C300
September 3, 2011
Plant & Equipment Work Instructions: Unmanned Lineside Building Services
General a) Check that any high/low temperature readings in the building are within tolerance. b) Check all units for damage, security, cleanliness and correct operation in all modes. c) Check that...

References

Advertisement