LUL - S1937
Pilot Boxes and Cable Terminations for Pilot Cables for Use on The System
inactive, Most Current
| Organization: | LUL |
| Publication Date: | 1 August 2013 |
| Status: | inactive |
| Page Count: | 29 |
scope:
This Standard applies to equipment and systems on the LU power system.
Purpose
The purpose of this LU Standard is to apply technical requirements for equipment and systems on the LU power system through the inclusion of a technical specification, previously owned and managed by the Power Service Contractor, UK Power Network Services (UKPNS) Powerlink, as an attachment to this standard.
Document History
S1937
August 1, 2013
Pilot Boxes and Cable Terminations for Pilot Cables for Use on The System
This Standard applies to equipment and systems on the LU power system.
Purpose
The purpose of this LU Standard is to apply technical requirements for equipment and systems on the LU power system...