UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

MODUK - DEF STAN 59-41: PT 3: SUPP S

Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement S: Test Method DCS11 Imported Long Transient Susceptibility - Power Lines (Sea Systems)

inactive, Most Current
Organization: MODUK
Publication Date: 1 January 1996
Status: inactive
Page Count: 10
scope:

Purpose

The purpose of this test is to ensure that transients typical of those produced by group switching of equipments on power lines will not damage or cause malfunction of the EUT.

Document History

DEF STAN 59-41: PT 3: SUPP S
January 1, 1996
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement S: Test Method DCS11 Imported Long Transient Susceptibility - Power Lines (Sea Systems)
Purpose The purpose of this test is to ensure that transients typical of those produced by group switching of equipments on power lines will not damage or cause malfunction of the EUT.

References

Advertisement