UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ARMY - UFGS-32 13 14

CONCRETE PAVEMENTS FOR SMALL PROJECTS

active, Most Current
Organization: ARMY
Publication Date: 1 April 2006
Status: active
Page Count: 36
scope:

NOTE:

This guide specification covers the requirements for construction of concrete pavement for airfields and heavy-duty roads and hardstands, and vehicular pavement with volumes less than or equal to 2000 cubic meters (2500 cu. yd.) of concrete. For larger concrete volumes, or if a more detailed specification is required, Section 32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS MORE THAN 10,000 CUBIC YARDS should be used.

Document History

UFGS-32 13 14
April 1, 2006
CONCRETE PAVEMENTS FOR SMALL PROJECTS
NOTE: This guide specification covers the requirements for construction of concrete pavement for airfields and heavy-duty roads and hardstands, and vehicular pavement with volumes less than or equal...

References

Advertisement