MODUK - DEF STAN 59-41: PT 3: SUPP G
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement G: Test Method DCS01 Conducted Susceptibility, Primary Power Lines 20 Hz - 50 kHz
inactive, Most Current
| Organization: | MODUK |
| Publication Date: | 1 January 1995 |
| Status: | inactive |
| Page Count: | 9 |
scope:
purpose
The purpose of this test is to confirm that the EUT will withstand ripple voltages imposed upon its power lines. The limits have been set taking into account levels likely to occur on power supplies.
Document History
DEF STAN 59-41: PT 3: SUPP G
January 1, 1995
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement G: Test Method DCS01 Conducted Susceptibility, Primary Power Lines 20 Hz - 50 kHz
purpose
The purpose of this test is to confirm that the EUT will withstand ripple voltages imposed upon its power lines. The limits have been set taking into account levels likely to occur on power...
September 30, 1994
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement G: Test Method DCS01 Conducted Susceptibility, Primary Power Lines 20 Hz - 50 kHz
Purpose
The purpose of this test is to confirm that the EUT will withstand ripple voltages imposed upon its power lines. The limits have been set taking into account levels likely to occur on power...
July 9, 1993
Electromagnetic Compatibility Part 3: Technical Requirements Test Methods and Limits Supplement G: Test Method DCS01 Conducted Susceptibility, Power Lines 20Hz - 50kHz
Purpose
The purpose of this test is to confirm that the EUT will withstand ripple voltages imposed upon its power lines. The limits have been set taking into account levels likely to occur on power...